Abstract Surface

Case Studies

image.png
processed-B73C6C3E-A1AE-47FB-824C-62C2895C4247.jpeg

Case Study 1: Lighting

Mt. Diablo Unified School District

2023-24

Lighting Scope Description

  • Installation & management of interior/exterior LED lighting fixture replacements/retrofits with Keystone Smartloop Bluetooth mesh controls and Lutron controls.

Number of Locations

  • 29 (Elementary, Middle, HS, and Adult Ed)

Job Value

  • $  6.3M 

Contra Costa County, CA

Case Study 2:Lighting

Fort Irwin Army Training Center

2024-25

Lighting Scope Description

  • Performed investment grade audit of ~3M square feet. Designed, specified, and installed LED Interior and Exterior lighting fixture replacements/retrofits using TAA/BAA compliant solutions while maintaining functionality of existing Lutron Eco-System controls where applicable. Specification and installation of new standalone occupancy controls where applicable. In-House commissioning/re-addressing of new Lutron Eco-System drivers.

Number of Locations

  • ~300 Base Wide

Job Value

  • $  8.0M

Picture6.jpg
Picture7.jpg

San Bernardino County, CA

Picture8.png

Case Study 3:Lighting

GSA San Diego Courthouse & Border Crossings

2023

Lighting Scope Description

  • Installation of management of TAA/BAA compliant LED lighting retrofits and fixture replacements for 2 border crossings and a Federal Courthouse in San Diego, CA. Installation at the Courthouse required maintaining functionality of existing Lutron Eco System controls including in sensitive areas such as Courtrooms and Judge’s Chambers.

Number of Locations

  • 3 : Tecate and Otay Mesa Border Crossings, Carter-Keep Courthouse

Job Value

  • $   1.85M

San Diego, CA

Case Study 4:Solar

Fairfield Unified School District Solar Project 

2023-24

Solar Scope Description

  • Installation and management of Structural, Underground, and Electrical scope for Carports (4) and Roof mount (1) PV installations across 5 sites

System Size

  • 1MW

Job Value

  • $    4.1M

Picture9.jpg
Picture10 (1).jpg

Fairfield, CA

Picture11.png
Picture12.jpg

Case Study 5:Solar

South Pasadena Unified School District Solar Project

2024

Solar Scope Description

  • In-House Install and Management of Structural, Underground, and Electrical scope for Carports (4) and Roof mount (2) PV installations across 6 sites

System Size

  • 1.235MW

Job Value

  • $   3.5M 

Pasadena, CA

Case Study 6: Multi-Measures (3) Solar, Lighting, HVAC

Copper Mountain College 

2022

3 Technologies Scope Description

  • In-House Design, Development LED Lighting, Management of HVAC, Underground, Electrical Scope for Carports (4) PV/EV/HVAC and Removal & Replacement of Existing Packaged HVAC Unit with 10-Ton Unit for Cooling Only

System Size

  • 110KW

Picture14.jpg

Joshua Tree, CA